Solving the AI Power Bottleneck
SigmaXCell: A fundamental transition from legacy grid hardware to a silicon-based 'Power Platform'.
260kW Cell | 1.1MW/m³ Density | 34.5kV Direct Link | 99%+ Efficiency
Solving the AI Power Bottleneck with the World’s First 34.5kV Solid-State Transformer (SST) Platform.
XCELLYNK doesn't compete with traditional power giants. We empower them by providing the 'Heart and Brain'—Modular SST Cells, Main Controllers, and Intelligence Algorithms—that drive next-generation energy efficiency.
SigmaXCell: A fundamental transition from legacy grid hardware to a silicon-based 'Power Platform'.
260kW Cell | 1.1MW/m³ Density | 34.5kV Direct Link | 99%+ Efficiency
While competitors (Heron, Amperesand) are limited to 4.16kV–12.47kV, SigmaXCell achieves world-first 34.5kV direct connection.
99%+ peak efficiency using SiC/GaN, saving millions in annual OPEX for 100MW data centers.
SigmaXCell uses only 28% of the legacy space.
Reclaiming 72% of the substation footprint allows for 3x more server racks in the same building. While SST CAPEX is higher, the Break-Even Point (BEP) is reached within 3–4 years.
| Category | NVIDIA | XCELLYNK |
|---|---|---|
| Core Unit | GPU (H100/B200) | ~260kW SST Cell |
| Interconnect | NVLink | SST Main Controller |
| Software | CUDA Ecosystem | Grid-Code & Sensing SW |
| Strategy | Partnering with Server OEMs | Partnering with Power Grid OEMs |
Led by core architects from global leaders like Siemens and Infineon. Focusing on core topology, control algorithms, and the global Grid-Code library.
Led by CEO Younghoon Lee (19-year power electronics veteran). Focusing on HF transformer simulation, cooling optimization, and KERI certification.
Immediate access to high-volume manufacturing across Vietnam, Mexico, and the USA.
Ensuring 'Made in USA' compliance and eligibility for IRA subsidies, de-risking global supply chain hurdles.
Our leadership's 19-year track record in high-power converter development is the ultimate insurance for our technical delivery.
Validation of 34.5kV insulation stability and 99%+ peak efficiency using the 260kW modular building block.
Integration of the Main Controller and initial commercial revenue via the Megawatt (MW) charging sector.
Large-scale bidding in the AI data center market and establishing the 'Sigma Power Inside' platform standard.
Target Price: $10,000 – $15,000 | Target Contribution Margin: 40-50%.
2028 ($0.40M) → 2030 ($1M) → 2035 ($3.34M)
Powered by the Sigma Power Inside standardized platform architecture.
AI Datacenters
Optimized extension of the Sigma Power Inside standard.
Photo Voltaic
Optimized extension of the Sigma Power Inside standard.
Energy Storage Systems
Optimized extension of the Sigma Power Inside standard.
Smart Grids
Optimized extension of the Sigma Power Inside standard.
Smart Factories
Optimized extension of the Sigma Power Inside standard.
Wind Power
Optimized extension of the Sigma Power Inside standard.
Megawatt Chargers
Optimized extension of the Sigma Power Inside standard.